/// Integration · Innovation · Implementation

Build it once digitally.
Then build it once in the field.

I-3 Technologies delivers clash-free, fabrication-ready mechanical, plumbing, and process-piping models for high-stakes industrial and commercial construction — catching constructability issues in the model, not in your ceiling.

60+years in the trades — we've installed what we model.MEP & process piping · Nationwide
I3-Coord · Model viewport
CLASH 014RESOLVED
RFIs ↓Clashes 0Fab-ready ✓
Modeled & coordinated inRevitNavisworksBluebeamAutoCAD
I3-Build · Constructability
A clash-free model that is not constructible✗ NO ACCESS✗ NO HANGERCLASHES 0 · NOT BUILDABLE
A trade-built, constructible modelACCESS ✓SUPPORTED ✓CLASHES 0 · FIELD-READY ✓
Clash-free on screenBuilt to install
Clashes 0Field-ready ✓

Both pass the clash check. Slide right toward “Built to install” — the model made by people who’ve installed it, with the maintenance access and supports a screen-only model misses. Slide left to see what it leaves out.

/// The difference

Clash-free on a screen isn’t the same as built to install.

Most detailers can drive a model to zero clashes. Far fewer have run the trades and installed what they model. We have — 60+ years of it — so the maintenance access, supports, and fab tolerances are right the first time.

The result: your crews build straight from the model — without the field calling back.

See the full comparison

/// The record

Trusted where coordination can’t be an afterthought.

20+ high-stakes facilities nationwide — semiconductor, healthcare, pharmaceutical, government, and food & beverage.

60+

Years combined trade experience

20+

High-stakes facilities

5

Industrial & commercial sectors

6

States, coast to coast

/// Names on the record

MotorolaSamsungIBMIntelUT HealthIU HealthSimtra BioPharmaStockton CourthouseE. & J. Gallo

/// Coordination, up close

  • Coordinated services running the length of a corridor, each trade held to its own routing lane.
    /// 01Service corridor
  • A dense multi-trade model with mechanical, piping, and fire-protection lines resolved together.
    /// 02Full coordination
  • Coordinated piping dropping to vessels and routed clear of access platforms.
    /// 03Process drops
  • A coordinated rack of large-diameter mains routed in parallel with trapeze hangers above process equipment.
    /// 04Coordinated main rack
  • Coordinated overhead piping and tanks routed above packaged mechanical units.
    /// 05Mechanical room
  • Piping coordinated around process vessels and their instrumentation.
    /// 06Process vessels

/// What we deliver

Built for the field, not just the screen.

Every model we build is judged by one thing: can your crews and fabricators build from it without a callback?

Coordination · Level 3
CLASH 014RESOLVED
Clashes 0Coordinated ✓
/// 01

Clash-free coordination

We integrate every discipline into one model and resolve the conflicts before construction — so routing, clearances, and access are right the first time.

  • Hard, soft, and workflow clashes resolved in Navisworks
  • Coordinated routing corridors + maintenance clearances
  • Fewer RFIs and change orders in the field
  • Coordination reports the whole team can track
Spool · SP-014
11'-4"SP-014
Welds taggedFab-ready ✓
/// 02

Fabrication-ready detailing

Shop drawings and piping spools your fabricators can build straight from — accurate, dimensioned, and tied back to the coordinated model.

  • Spool and assembly drawings for off-site prefab
  • Mechanical & plumbing shop drawings
  • Supports purchasing + just-in-time delivery
  • Less on-site welding, less rework
Crew · Trade record
60+YEARS COMBINED · MEP & PROCESS PIPINGPROCESS PIPINGMECHANICALPLUMBING
60+ yrsTrade-built ✓
/// 03

Built by trades, not just modelers

Decades of real construction and fabrication experience behind every model — so coordination decisions reflect how the work actually installs.

  • 60+ years combined in MEP & process piping
  • Semiconductor, pharma, healthcare, industrial
  • Constructability caught early, not in the ceiling
  • A partner who speaks your crews’ language

/// How we work

A disciplined path from model to fabrication-ready handoff.

01

Model

We build the mechanical, plumbing, and process-piping systems at the level of detail your fabrication and installation actually need.

02

Coordinate

Every discipline is integrated and clash-checked in Navisworks. Conflicts are resolved in the model, with reports your team can track.

03

Detail

Coordinated systems become fabrication-ready shop drawings and piping spools — dimensioned, tagged, and ready for the shop.

04

Fabricate-ready handoff

You get models and documentation that drive purchasing, prefab, just-in-time delivery, and a clean field install.

/// The people behind the work

The 60+ years has two names.

Trent Staton and Dan Sherman built their careers running the trades and installing the systems they now model and coordinate — so every decision reflects how the work actually goes in.

Meet the team

S. Trent Staton

CEO & Founder

31 years in MEP piping construction & detailing — semiconductor to pharma.

Dan Sherman

Lead VDC Detailer

33 years bridging design and the field — Revit, Navisworks, Bluebeam.

I3-Coord · New project

/// Start a project

Have a project coming up?

Send us the scope. We’ll tell you straight how we’d coordinate and detail it — and what it takes to make it fabrication-ready.

Send the scopeFab-ready model back